MANISA FULLY AUTOMATED CAR PARKING, CITY CENTER
2016Manisa Project is Turkey‘s largest fully automated parking system with a capacity of 560 cars.
Manisa Project is Turkey‘s largest fully automated parking system with a capacity of 560 cars. The system enables parking 7 cars at the same time within an average operation time of 105 seconds. Thanks to the system applied at 930m2 footprint area and 17.50m height, 44m3 volume per vehicle has been provided.
Fully Automated parking system, Left-Right position on floor, Created by R&D Center, High Speed, Environmental and Energy saver...